The Grupo Secacao team is at your service to provide information and respond to your requests. Get in touch with us and we will be happy to assist you.


Contact information

Office hours

Monday to Friday - 7:00 a.m. to 4:00 p.m.

Address

9 calle 18-18 zona 14, Tower II, AICSA Building, 9th floor, Office 901, Guatemala City, Guatemala.

Follow us
Contact information

Office hours

Monday to Friday - 7:00 a.m. to 4:00 p.m.

Address

9 calle 18-18 zona 14, Tower II, AICSA Building, 9th floor, Office 901, Guatemala City, Guatemala.

Follow us

Group Companies

Group
Companies

Grupo Secacao brings together companies in renewable energy generation, agroforestry projects and real estate investments. Each one contributes to the same vision: creating value responsibly and sustainably for Guatemala and the region.

Hydroelectric plants

Secacao Hydroelectric Plant
In operation since1998
Senahú, Alta Verapaz

Secacao Hydroelectric Plant

The Group's first power plant. Construction began in 1996 and commercial operation started in 1998.

16.13 MW Installed capacity
90.91 GWh Annual generation
90,000 Estimated I-RECs per year
74,820 t CO₂ avoided per year
Turbine Pelton
Flow rate 3.8 m³/s
Head 524 m
Candelaria Hydroelectric Plant
In operation since2006
Senahú, Alta VerapazRegistered with the UN (CDM)

Candelaria Hydroelectric Plant

Developed under the Clean Development Mechanism (CDM), it began operating in 2006. It is considered one of the first projects in Guatemala to be registered with the Executive Board of the United Nations Framework Convention on Climate Change.

4.45 MW Installed capacity
22.7 GWh Annual generation
18,685 Estimated CERs per year
18,685 t CO₂ avoided per year
Turbine Francis
Flow rate 3.8 m³/s
Head 129 m
Choloma Hydroelectric Plant
In operation since2011
Senahú, Alta VerapazEngineering Excellence Award · ACEC

Choloma Hydroelectric Plant

Technically complex for its small scale, the plant began operating in 2011. The American Council of Engineering Companies (ACEC) presented its Engineering Excellence Award to the Choloma Hydroelectric Project, together with the U.S. firm McMillen.

9.59 MW Installed capacity
27.18 GWh Annual generation
22,365 Estimated CERs per year
22,365 t CO₂ avoided per year
Turbine Pelton
Flow rate 2.36 m³/s
Head 460 m
Guayacán Hydroelectric Plant
In operation since2014
Taxisco, Santa RosaDistributed Renewable Generation

Guayacán Hydroelectric Plant

It is the first Distributed Renewable Generation plant developed by Grupo Secacao and began operating in 2014. The plant is not connected to the high-voltage transmission grid, but directly to the distribution grid.

2.92 MW Installed capacity
7.25 GWh Annual generation
7,246 Estimated I-RECs per year
5,963 t CO₂ avoided per year
Turbine Pelton
Flow rate 3.8 m³/s
Head 92 m

Solar energy

Our projects are developed sustainably, based on best social, environmental, technical and financial practices, from design through construction and operation.

GENESUN solar plant In operation
Commercial operation2026
Champerico, Retalhuleu

GENESUN solar plant

Grupo Secacao's first solar photovoltaic project, consolidating our commitment to diversifying the energy mix and developing renewable solutions.

4 MW Installed capacity
11 GWh Annual generation
11,000 Estimated CERs or I-RECs per year
3,239 t CO₂ avoided per year
Capacity factor 24.31%
Commercial operation July 1, 2026
Interconnection 13.8 kV
ENSOL solar plant Under development
Commercial operation2026
Champerico, Retalhuleu

ENSOL solar plant

20 MW Installed capacity
48 GWh Annual generation
48,000 Estimated CERs or I-RECs per year
14,136 t CO₂ avoided per year
Capacity factor 24.63%
Commercial operation September 2026
Interconnection 69 kV
SUNERGY solar plant Under development
Commercial operation2028
Siquinalá, Escuintla

SUNERGY solar plant

50 MW Installed capacity
132 GWh Annual generation
132,000 Estimated CERs or I-RECs per year
38,874 t CO₂ avoided per year
Commercial operation January 2028
Interconnection 69 kV
Photovoltaic projects in the Dominican Republic In operation
Start of operations2016
Dominican Republic

Photovoltaic projects in the Dominican Republic

Operations in the Dominican Republic began in 2016 with photovoltaic projects. Making use of available rooftop space, more than 36 operational projects were installed around the city, with an approximate capacity of 14.8 MWp. We plan to expand this type of project in the future.

+36 Rooftop projects
14.8 MWp Of capacity
2016 Start of operations
Expanding Further projects are planned

Agroforestry

Our agroforestry projects began in 2003 in Senahú, Alta Verapaz, with three objectives:

Protect river basins and strengthen water recharge through the conservation of forests and plantations.

Create new job opportunities for the communities near our hydroelectric projects.

Make sustainable use of the land in Senahú, Alta Verapaz.

Rubber plantations
557 ha

Rubber

Since 2009 we have used 557 hectares suitable for rubber plantations to ensure the reforestation of our river basins and water sources and the conservation of the land. The plantations provide continuous employment 10 months a year, in 30-year production cycles, producing high-quality latex and solids for national and international markets.

Pine and white cedar forest plantations
389 ha

Forestry

To conserve the land and diversify crops, we have 89 hectares of pine and 300 hectares of white cedar (palo blanco). These long-term crops, with harvest cycles of 20 to 25 years, conserve soils and water sources and protect species of flora and fauna.

Protected virgin rainforest
1,000 ha

Virgin rainforest

Conserved, protected and registered with the National Forest Institute (INAB), these forests are the main habitat for more than 700 species of flora and fauna in the north of the country.

Business line

Real Estate

Investment in residential and commercial complexes, with the mission of transforming people's quality of life and making it more practical and convenient.

Céntrico Zone 5, Guatemala

Céntrico

A project with a design inspired by Europe's great cities and quality finishes, combining residential and commercial areas in four towers with 538 apartments.

Visit website
Atarah Zone 10, Guatemala

Atarah

The Group's second residential investment project, with three towers and 500 apartments, plus commercial spaces that foster community life.

Visit website
Alana Guatemala

Alana

More information about this project coming soon.

Visit website